Skip to main content
DriftLess logoDriftLess
Docs - Get unstuck

When credits are too low for the next change

Choose a smaller change, wait for included credits, buy an eligible pack, or change plan.

DriftLess pauses new hosted work when the available balance cannot safely cover it. The private website and finished versions remain available even when generation is paused.

How to use this

  1. 1Check the balance and the size of the requested change.
  2. 2Split a broad redesign into the single most important improvement when appropriate.
  3. 3Wait for the included monthly allowance to refresh.
  4. 4Use the one-time Touch-Up pack on First Look if it is still available.
  5. 5Choose Maker or Studio when ongoing website work and publishing are needed.

Keep in mind

  • A smaller request should still solve a real customer or maker problem.
  • Purchased packs add credits but do not replace the paid publishing entitlement.
not enough website creditsDriftLess credit balancewebsite update paused

Last reviewed: 2026-07-14